9447 - Wendell H. Ford Regional Training Center - US Army National Guard - Wendell, KY

PHASE II: Standby Generator System-Support Infrastructure.
This project consists of installation of high voltage overhead line work (by Kentucky Utilities), fiber optic communications, natural gas and water supply to support power generation equipment by others.
NESI will furnish all coordination and pay all costs between Kentucky Utilities and the generation equipment supplier for the complete interface to the utilities companies existing overhead distribution system. NESI will furnish, install and test underground communication between the owner computer network, high voltage reclosures and the power generation equipment (by others).Domestic water will be provided to the generation site, originating at the Owner’s existing distribution system and extending underground to a yard hydrant. Natural gas will be extend from the utility company, adjacent to the site, reduced in pressure and extended both above and below grade and connected to three generators (by others).
Return to Generator Projects